Distribution Centre Design

Case overview

Customer: Outdoor Equipment Distributor

Date Completed: November 2015

Scope of Work:

  • Site survey
  • Layout Auto-Cad design
  • Material supply
  • Installation & inspection
  • Engineered Auto-Cad drawing
  • Products supplied:

    • Pallet Racking
    • Guard Rail
    • Post Protector
    • Security cage

The Results:

Optimized
Layout
Maximized
Vertical Storage Capacity
Enhanced
Facility Safety
Seamless
Installation
Seamless
Installation

“The design and installation of our distribution center were spot on. The layout optimized our storage and workflow, and the safety features like guard rails and post protectors give us peace of mind. The team was professional, efficient, and thorough throughout the entire process. We’re now able to operate more smoothly and securely—exactly what we needed.”

Check out other projects